MADISON, SOUTH DAKOTA
Crossing Park Creek along Garfield Avenue in Madison, SD, the bridge structure project replaced the deteriorating single-span bridge structure. With the design and funding completed by SDDOT, the Sioux Falls Area Office then hired Brosz Engineering provide full construction engineering services. Services included construction administration, construction inspection, materials testing, construction staking, and project close-out.
The project began in June 2020 and was completed in November 2020. Work activities and improvements included:
- temporary channel diversion
- existing bridge removal
- sanitary sewer retrofit
- steel pile installation
- foundation and bridge deck construction
- sidewalks
- pedestrian railings
- erosion control
- asphalt surfacing