The Randall Community Water District (RCWD) has recently completed constructing the US Highway 18/281 Pipeline Relocation project. The water lines, carrying treated and raw water respectively, were relocated to prepare for a bridge replacement project with SDDOT near North Point State Recreation Area. The project, located adjacent to Lake Francis Case, installed over 18,000 feet of 24 inch PVC pipe. It also included four road borings (three which go under Highway 18).

Brosz Engineering is proud to partner with RCWD to provide planning, permitting, design, and construction administration services. This important project allowed RCWD to continue to serve existing customers while providing the capacity for new services in the future.

Project Details

YEAR
2019 Design
2020 Construction

CONSTRUCTION VALUE
$4,500,000

Services

Planning

Surveying

Preliminary Engineering Construction Engineering

Owner Benefits

  • Reliable sewer service for residents and businesses
  • Treated water used for golf course irrigation
  • Increased overall system capacity
  • Improved environmental conditions